Case Study
Northam Aquatic Centre
4 X Slide Complex Terminating Into A Landing Pool
Painted steel support structure and tower/tower access
Slides descending off stepped platforms –
- 2 x slides off 8.64m
- 1 x slide off 5.76m
- 1 x slide off 2.88m
Case Study
Lake Talbot, NARRANDERA Footprint of 2 x 800mm slides 39m x 12m
Name Of Facility: Northam Aquatic Centre
Location: Northam, W.A.
Completion Date: Completed On Time And Within Budget July – Dec 2019
General Description: 4 X Slide Complex Off A Stepped Tower Multi Coloured Slides, Shade Structure Over Top Platform And 3 Coat Paint System For Steel, Supplied Hdb Cages For Footings
Target Age Group: As A Design Request All Rides Were Fast Rides But Suitable For All Age Groups Therefore Catering For The Whole Family.
1 x Fast 800mm Enclosed Tube Ride
1 x Fast Open Reverse-banked Supajet Ride
1 x Fast 1200mm Enclosed Tube Ride
1 x Very Fast But Short Enclosed Tube Ride – Dropping Into The Pool
By Design Waterslides Appealed To All Ages –
Awl Recommended That Children Had To Be In Excess Of 1.1 Metres In Height To Ride The Slides
Small Children Were Catered For In A Separate Area
This Location Did Not Require A Cyclone Rated Design
Was This Design And Construct: No – Awl’s Scope Was Design And Supply And Install The Waterslides, Waterslide Supprt Stuctures And Supply Footing Hdb Cages – Hydraulics And Civils Works By Others.