Holland Park Swimming Centre
Case Study Holland Park Swimming Centre West Wyalong, NSW Council Pool Under Lease From Bland Shire Council Terminating into an Existing Landing Pool that also doubles for a Learn to Swim Pool. Replacement of old for new fiberglass Starter section was refurbished to negate hydraulics disruption to water supply Original slide installed by AWL in […]
Northam Aquatic Centre
Case Study Northam Aquatic Centre 4 X Slide Complex Terminating Into A Landing Pool Painted steel support structure and tower/tower accessSlides descending off stepped platforms – 2 x slides off 8.64m 1 x slide off 5.76m 1 x slide off 2.88m Case Study Lake Talbot, NARRANDERA Footprint of 2 x 800mm slides 39m x 12m […]
Lake Talbot Waterpark
Case Study Lake Talbot Waterpark Narrandera NSW Installation July-Nov 2019 Design and Construction Contract 2 x Duelling mirror-reversed body rides in 800mm diametre tube Incorporating Special Effects fiberglass – A race to the end!! 1 x Open Reverse-banked SupaJet slide – Fun for all the family Case Study Open Reverse-banked Section Does not require splash […]